17 June 2011

Quick Update

      A brief tour yesterday allowed us to see the progress so far this week.  We were very impressed by the kitchen!  The cabinets have yet to be painted and fitted with handles and pulls, but everything looks lovely and perfect.  I will post pictures later when things look tidier.

     The storage space under the stairs to the loft was fitted with shelves.  The door will come later and will be painted the same color as the wall so as to be less conspicuous.


     The music & work cabinets in the Master Bedroom are beginning to take shape.  This is the computer desk which will be fitted with an undershelf for the keyboard.  This workspace will mainly be used by Efrain for music recordings.  It has definitely a good idea to make this custom, for sturdiness.  Don't want a cabinet full of instruments falling onto us during the night on the next earthquake.


     On the first floor, the small box where our router and other communication equipment will converge was installed.  It will be fitted with door and hidden behind furniture in the studio.


Also, another new development was taking place outdoors. 
The balcony tiles were being installed. 


     Except for a few adjustments that need to be made here and there, things are advancing as planned. During the remainder of the week, the tiles in the Powder Room and Toilet should be installed.  We'll try to go back Saturday for a quick look!